• Videos
  • Shop
  • Contact
No Result
View All Result
  • Videos
  • Shop
  • Contact
No Result
View All Result
Fishing Fly Tackle
No Result
View All Result

Prolong Leader Life With Tippet Rings

April 8, 2023
tippet ring

Image: Louis Cahill

Kent Klewein keeps in mind, in a current story over at Gink & Fuel, that leaders have actually gotten quite pricey recently. He’s best– a 3 pack of fluorocarbon leaders can run an angler around $15, or more. So, one method to increase the life-span of this important part of fly fishing deal with is to utilize tippet rings.

Kent explains on how he utilizes tippet rings for his leaders, and you can read all of it here.

Share this:

  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on X (Opens in new window) X

Like this:

Like Loading...
Share120Tweet75Share30
admin

admin

Related Posts

New from Fishpond for 2026: Fly Boxes and a Handcrafted Bamboo Wading Staff Lead the Lineup
Accessories

New from Fishpond for 2026: Fly Boxes and a Handcrafted Bamboo Wading Staff Lead the Lineup

November 11, 2025

Fishpond’s 2026 collection marks a significant refresh of a few of its most relied on styles, with brand-new products, reimagined staples, and a broadened concentrate on sustainability. According to the maker, the lineup consists of brand-new colors and designs...

American Museum of Fly Fishing Announces New Commemorative-Tackle Program
Fly Reels

American Museum of Fly Fishing Announces New Commemorative-Tackle Program

November 9, 2025

In an effort to continuously bring fly-fishing history to light in brand-new and fascinating methods, the American Museum of Fly Fishing is starting an interesting program to produce celebratory pieces of timeless American deal with in collaboration with a...

Yakoda (Re)Builds Their Nippers for a New Generation
Accessories

Yakoda (Re)Builds Their Nippers for a New Generation

October 31, 2025

Yakoda's objective was to construct nippers that will stand the test of time however will not spend a lot. Yakoda Supply has actually re-engineered among their most popular devices with the release of the next-generation Yakoda Nipper ($ 89)....

Costa Expands Introduces New Sunglasses for Young Anglers
Eyewear

Costa Expands Introduces New Sunglasses for Young Anglers

October 19, 2025

The Schoolie (top) uses a smooth style fit to smaller sized faces, and the Street Heat includes a touch of internet user culture. Pictures: Courtesy Costa By: Rick Mikesell, MidCurrent Equipment Expert Costa Sunglasses has actually revealed the release...

Please login to join discussion

Categories

  • #20sepdays (4)
  • 10 foot (1)
  • 2 (1)
  • 2020 F3T (1)
  • 2021 F3T (5)
  • 2022 (1)
  • 2022 F3T (1)
  • 2022 fly fishing film tour (1)
  • 2022 Montana Fishing Film Festival (2)
  • 2023 Montana Fishing Film Festival (3)
  • 2024 (1)
  • 25 ON THE FLY (1)
  • 49 foot (1)
  • 5 flies (1)
  • 5 weight (1)
  • 5050 on the water (7)
  • A River Runs Through It (2)
  • Aardvark McLeod (1)
  • Accessories (9)
  • ace (1)
  • Advanced Trout (1)
  • AFFTA (1)
  • AFFTA Fisheries Fund (1)
  • africa fly fishing (1)
  • ahrex (2)
  • ahrex hooks (2)
  • Ain't No Nookie Without Snookie (1)
  • Airflo (1)
  • Alaska (3)
  • Alaska fly fishing (1)
  • All around trout (1)
  • alpine (1)
  • alpine lake (2)
  • alsea (1)
  • Alvin Dedeaux (9)
  • America's Most Endangered Rivers (1)
  • American Museum (1)
  • American Rivers (1)
  • American Saltwater Guides Association (4)
  • Anchovy (1)
  • and (1)
  • angie (1)
  • angler survey (1)
  • anglers (1)
  • announcements (1)
  • Another One Bites The Dust (1)
  • ant (3)
  • ant pattern (1)
  • ape (1)
  • Apparel (10)
  • april (1)
  • aquatic insect (1)
  • Arapaima fly fishing (1)
  • Archives (384)
  • arizona fly fishing (1)
  • arkansas fly fishing (1)
  • Art (10)
  • artic char (1)
  • ASA (1)
  • ASGA (2)
  • Ashland Fly Shop (1)
  • ask the experts (2)
  • ASMFC (3)
  • Atlantic Salmon (3)
  • Atlantic Salmon Federation (1)
  • attractor (1)
  • auction (1)
  • Austin Football Club (1)
  • avantt (1)
  • avantt ii (1)
  • B-roll (1)
  • back (1)
  • Backcountry (1)
  • Backcountry Skinz (2)
  • backcountryskinz (1)
  • Backpacking (1)
  • Backwater Fly Fishing (6)
  • Baetis (4)
  • bahamas (1)
  • bahamas fly fishing (1)
  • bait (1)
  • bait ball madness (3)
  • Baja (1)
  • Bajio Sunglasses (4)
  • basin (1)
  • Bass (1)
  • beach (1)
  • beach fly fishing (1)
  • Bears (1)
  • Beavers (1)
  • beetle (5)
  • belize fly fishing (1)
  • Bend OR (1)
  • Benny Blanco (2)
  • best (1)
  • bethke (1)
  • Betsy Bullard (1)
  • Biden Administration (2)
  • big (1)
  • big game (2)
  • Big Hole River (1)
  • Big Hole Watershed (1)
  • bitterroot (1)
  • BlacktipH (1)
  • blog (1)
  • Blue (2)
  • Blue Horizon Lodge (1)
  • Blue wing olive (2)
  • Blue winged olive (4)
  • Bluewing Olive (1)
  • Bluewinged Olive (1)
  • boat fishing (1)
  • boat porn (1)
  • Bob Reece (1)
  • Bonefish (1)
  • Bonefish Tarpon Trust (2)
  • Books (11)
  • Boot (1)
  • boots (1)
  • Border To Bayou (1)
  • BOTE (1)
  • brew (2)
  • brewery (1)
  • Brian O'Keefe (1)
  • Bristol Bay Fly Fishing and Guide Academy (1)
  • British Columbia (2)
  • brook trout (1)
  • brotherhood (1)
  • brown (3)
  • brown trout (2)
  • brownmarch brown (1)
  • Bruce Hornsby (1)
  • Bruce Springsteen (1)
  • BTT (3)
  • Bud Lilly (1)
  • Buffet Series (1)
  • Buffet Series Season 2 (1)
  • Buffet Series Season 3 (1)
  • bugs (4)
  • bull (1)
  • bull trout (1)
  • Bullsugar (1)
  • Butte Creek (1)
  • buzzer (1)
  • BWO (5)
  • caddis (9)
  • caddis fly (1)
  • Caddis Fly Shop (4)
  • caddis pupa (1)
  • caddisfly (1)
  • Caddisflyshop.com (1)
  • california fly fishing (1)
  • Callibaetis (1)
  • CalTrout (1)
  • canada fly fishing (1)
  • candy (1)
  • Captain Jeff (1)
  • Captain Quinn (1)
  • Captains for Clean Water (4)
  • Carl Hiaasen (1)
  • carpe diem (2)
  • Cascades (1)
  • Cast From The Past (6)
  • Casting (1)
  • Casting For Recovery (1)
  • Catch Magazine (2)
  • CDC (1)
  • Central (1)
  • Central Oregon Fishing Report (22)
  • Chad Brown (1)
  • charity (1)
  • charlie (1)
  • Charlie Craven (2)
  • Chase Bartee (1)
  • Chilcoltin steelhead (1)
  • chile fly fishing (1)
  • chironomid (1)
  • chironomids (1)
  • chrome (1)
  • Chubby Chernobyl (1)
  • Chum (1)
  • Chumion (1)
  • cicada (1)
  • Classes and Instruction (25)
  • Classic (1)
  • clear tip (1)
  • Clearwater (1)
  • Climate Change (1)
  • coast (1)
  • coastal cutthroat (2)
  • coastal cutthroat trout (2)
  • Coastal Steelhead Fishing (19)
  • cocktails (1)
  • collaboartive (1)
  • colorado fly fishing (4)
  • Colorado River (1)
  • Commentary (96)
  • community (4)
  • condition (1)
  • Conservation (222)
  • conservation hawks (1)
  • convoy (1)
  • convoy gear roll (1)
  • coral reefs (1)
  • Costa (4)
  • Costa Films (2)
  • Costa Gear Garages (1)
  • Costa Sunglasses (1)
  • cover dog contest (1)
  • crab (1)
  • crane (1)
  • Crash Course (1)
  • craven (1)
  • creek (5)
  • cricket (4)
  • cripple (5)
  • Cutt (1)
  • cutthroat (6)
  • Cutty (1)
  • Dakine (1)
  • dam removal (1)
  • DamNation (3)
  • Damsel Fly Fishing (1)
  • Dan Bailey (1)
  • David Crosby (1)
  • davis (1)
  • day (2)
  • Dead Zone (1)
  • Dec Hogan (1)
  • deer (1)
  • deer hair (1)
  • Delicate (2)
  • deschutes (1)
  • Deschutes River (1)
  • Desert Trout (1)
  • dickheads of the week (1)
  • digital magazines (4)
  • diversity (2)
  • Do Epic Shit (1)
  • Do yo remember (1)
  • dog news (1)
  • dog photos (3)
  • Dogfish Tuna (1)
  • Dogs (4)
  • dorado (3)
  • dragonflies (1)
  • Dragonfly Boatworks (1)
  • drainage (1)
  • drake (1)
  • Drew LookN Fishy (1)
  • drifltess (1)
  • driftless (3)
  • Driftless Area (2)
  • driftless cricket (1)
  • Drive-By Truckers (1)
  • drone footage (1)
  • drones (1)
  • Drop (1)
  • dropper (2)
  • dry (7)
  • dry dropper (3)
  • dry flies (2)
  • Dry Fly (32)
  • dry fly fishing (3)
  • dry-fly fishing (1)
  • dryfly (1)
  • dun (3)
  • Dylan Tomine (2)
  • Eastern (1)
  • Eastern Oregon (15)
  • Ed Sozinho (1)
  • Egg (3)
  • Elegant (1)
  • Emerald Water Anglers (2)
  • emerger (7)
  • emerger fly (1)
  • emergers (1)
  • emerging (2)
  • emerging insect (1)
  • ep (1)
  • ep fibers (1)
  • EPA (1)
  • Eric Estrada (1)
  • Erik Estrada (2)
  • eugene (1)
  • euro (2)
  • Euro nymphing (1)
  • euro-nymphing tips (1)
  • evazote (1)
  • evening (1)
  • Event (7)
  • Events (42)
  • Everglades (4)
  • Experts (83)
  • Eyewear (10)
  • F3T 2022 (1)
  • F3T 2023 (3)
  • F3T 2024 (2)
  • fall (5)
  • fall caddis (1)
  • fall fly fishing (1)
  • fall river (1)
  • falling (4)
  • falling sky (2)
  • Far Bank (2)
  • Far Bank Fly Fishing School (1)
  • farmed fish suck (1)
  • fat (1)
  • fat angie (1)
  • fathers day (1)
  • fathers day 2024 (1)
  • fathers day gift (1)
  • fathers day shopping (1)
  • Fear and Loathing On The Fly (2)
  • Featured (8)
  • feeding time (1)
  • ffc (1)
  • film (2)
  • film tour (1)
  • film trailers (1)
  • Fiordland (1)
  • first nations (1)
  • fish (1)
  • fish art (7)
  • Fish BC (1)
  • fish carving (1)
  • fish crimes (1)
  • fish facts (3)
  • fish friends (1)
  • fish hatcheries (1)
  • fish history (1)
  • fish in the news (5)
  • fish politics (2)
  • fish science (3)
  • Fish Tunes (3)
  • fish videao (1)
  • fish video (11)
  • fishi (1)
  • fishing (48)
  • fishing accessories (1)
  • Fishing BC (1)
  • fishing business (1)
  • fishing fails (1)
  • fishing films (1)
  • fishing guides (1)
  • fishing humor (2)
  • Fishing Porn (21)
  • fishing report (20)
  • Fishing Reports (107)
  • fishing video (7)
  • fishing videos (1)
  • Fishing with Jay (2)
  • fishingn (1)
  • Five Flies (1)
  • Flats (2)
  • Flats Fly Fishing (3)
  • fli (1)
  • Flies (119)
  • Flip Pallot (1)
  • floating (1)
  • florida fly fishing (7)
  • fluvial geomorphology (1)
  • Fly (49)
  • fly boxes (2)
  • Fly Casting (16)
  • fly casting lessons (2)
  • fly casting tips (5)
  • fly casting videos (4)
  • Fly Fish America (1)
  • Fly Fisherman Magazine (1)
  • Fly Fishers International (1)
  • Fly Fishing (467)
  • fly fishing accessories (1)
  • fly fishing ai (1)
  • fly fishing art (2)
  • fly fishing at night (1)
  • Fly Fishing Books (9)
  • fly fishing buffet (1)
  • fly fishing business (10)
  • fly fishing competitions (1)
  • fly fishing contest (1)
  • Fly Fishing Contests (19)
  • fly fishing destinations (2)
  • fly fishing dogs (1)
  • fly fishing down under (2)
  • fly fishing entomology (1)
  • fly fishing events (2)
  • fly fishing film (7)
  • fly fishing film teaser (1)
  • Fly Fishing FIlm Tour (4)
  • fly fishing film tour trailer (1)
  • fly fishing film tours (2)
  • fly fishing film trailer (7)
  • fly fishing film trailers (6)
  • fly fishing films (7)
  • fly fishing for apache trout (1)
  • fly fishing for arctic char (2)
  • fly fishing for bass (2)
  • fly fishing for bluegills (1)
  • fly fishing for bonefish (2)
  • fly fishing for brook trout (1)
  • fly fishing for brown trout (1)
  • fly fishing for carp (6)
  • fly fishing for coho (1)
  • fly fishing for gar (1)
  • fly fishing for juvenile tarpon (1)
  • fly fishing for kingfish (1)
  • fly fishing for landlocked salmon (2)
  • fly fishing for marble trout (1)
  • fly fishing for muskie (1)
  • fly fishing for musky (2)
  • fly fishing for nile perch (1)
  • fly fishing for permit (6)
  • fly fishing for pike (2)
  • fly fishing for rainbow trout (1)
  • fly fishing for redeye bass (1)
  • fly fishing for redfish (7)
  • fly fishing for sailfish (1)
  • fly fishing for salmon (2)
  • fly fishing for seatrout (1)
  • fly fishing for smallmouth bass (2)
  • fly fishing for snook (1)
  • fly fishing for speckled trout (1)
  • fly fishing for steelhead (3)
  • fly fishing for striped bass (1)
  • fly fishing for taimen (1)
  • fly fishing for tarpon (6)
  • fly fishing for tigerfish (1)
  • fly fishing for trout (1)
  • fly fishing for wipers (1)
  • fly fishing for yellowtail kingfish (1)
  • fly fishing gear (8)
  • Fly Fishing Gear Review (42)
  • Fly Fishing Glossary (11)
  • fly fishing hero (1)
  • fly fishing highway (1)
  • fly fishing history (1)
  • Fly Fishing Humor (1)
  • fly fishing in Africa (1)
  • fly fishing in Alaska (1)
  • fly fishing in Andros (1)
  • fly fishing in Arizona (1)
  • fly fishing in Australia (1)
  • fly fishing in Baja (3)
  • fly fishing in Belize (3)
  • fly fishing in Canada (1)
  • fly fishing in Costa Rica (2)
  • fly fishing in Honduras (1)
  • fly fishing in Iceland (1)
  • fly fishing in Italy (1)
  • fly fishing in Kashmir (1)
  • fly fishing in Kenya (1)
  • fly fishing in Lapland (2)
  • fly fishing in Maine (2)
  • fly fishing in Michigan (1)
  • fly fishing in Minnesota (1)
  • fly fishing in Momtana (1)
  • fly fishing in Montana (3)
  • fly fishing in New Zealand (6)
  • fly fishing in Norway (1)
  • fly fishing in Oman (1)
  • fly fishing in Patagonia (2)
  • fly fishing in Russia (1)
  • fly fishing in Scotland (1)
  • fly fishing in South Africa (1)
  • fly fishing in Spain (1)
  • fly fishing in Sweden (2)
  • fly fishing in Tasmania (1)
  • fly fishing in Texas (3)
  • fly fishing in the Bahamas (2)
  • fly fishing in the news (2)
  • fly fishing in the Seychelles (1)
  • fly fishing in Utah (1)
  • fly fishing in Wyoming (1)
  • fly fishing instruction (5)
  • fly fishing knots (3)
  • fly fishing magazines (5)
  • fly fishing meditation (1)
  • fly fishing movie (1)
  • fly fishing news (3)
  • fly fishing patterns (2)
  • fly fishing photography (3)
  • fly fishing photos (4)
  • fly fishing podcast (2)
  • fly fishing podcasts (14)
  • Fly Fishing Profiles (10)
  • fly fishing real estate (1)
  • fly fishing safety (2)
  • fly fishing saves lives (7)
  • fly fishing still water (1)
  • fly fishing stories (6)
  • fly fishing the Ozarks (1)
  • fly fishing tips (26)
  • fly fishing trailer (1)
  • Fly Fishing Travel (55)
  • Fly FIshing Treasures (6)
  • fly fishing trivia (2)
  • fly fishing tutorial (1)
  • fly fishing TV (1)
  • fly fishing video (187)
  • fly fishing video. baby tarpon (1)
  • fly fishing video. coho on the fly (1)
  • fly fishing video. fly fishing solo (1)
  • fly fishing videos (33)
  • fly fishing waders (1)
  • fly fishing writing (4)
  • fly fising video (1)
  • Fly line (2)
  • Fly Lines (12)
  • Fly Out TV (1)
  • fly patterns (1)
  • Fly Reels (21)
  • fly rod (1)
  • Fly Rod Review (1)
  • Fly Rods (27)
  • fly selection (1)
  • Fly Tying (160)
  • Fly Tying Gear (3)
  • fly tying instruction (4)
  • fly tying instructions (1)
  • Fly Tying Materials (2)
  • Fly Tying Materials and Supplies (112)
  • fly tying pattern (1)
  • fly tying photos (1)
  • fly tying recipes (11)
  • fly tying step by step (1)
  • fly tying tips (31)
  • Fly Tying Tools (1)
  • fly tying tutorial (2)
  • fly tying video (12)
  • fly tying videos (23)
  • Fly vs Jerk (1)
  • fly-casting tips (9)
  • fly-casting videos (10)
  • fly-fishing destinations (5)
  • fly-fishing for atlantic salmon (1)
  • fly-fishing for bass (5)
  • fly-fishing for bonefish (2)
  • fly-fishing for brook trout (3)
  • fly-fishing for brown trout (6)
  • fly-fishing for cutthroat trout (1)
  • fly-fishing for largemouth bass (2)
  • fly-fishing for permit (2)
  • fly-fishing for rainbow trout (4)
  • fly-fishing for redfish (5)
  • fly-fishing for smallmouth bass (4)
  • fly-fishing for steelhead (9)
  • fly-fishing for striped bass (3)
  • fly-fishing for tarpon (1)
  • fly-fishing gear (6)
  • fly-fishing guides (1)
  • fly-fishing history (2)
  • fly-fishing humor (2)
  • fly-fishing knots (6)
  • fly-fishing news (4)
  • fly-fishing photos (16)
  • fly-fishing podcasts (23)
  • fly-fishing schools (1)
  • fly-fishing stories (3)
  • fly-fishing tips (185)
  • fly-fishing travel (1)
  • fly-fishing trivia (2)
  • fly-fishing videos (174)
  • fly-tying patterns (1)
  • fly-tying recipes (16)
  • fly-tying tips (37)
  • fly-tying videos (63)
  • FlyCraft (2)
  • flyfishing (1)
  • Flyfishmex (1)
  • flytying (2)
  • foam (1)
  • food and drink (1)
  • For Wild's Sake (1)
  • Fork (1)
  • Forra (1)
  • Forra Boot (1)
  • Frank Kuiack (1)
  • Free The Chum (2)
  • Fresh Chum (321)
  • friday film festival (39)
  • Friday Pin Up (1)
  • frly fishing tips (1)
  • fulling mill (3)
  • fy-fishing videos (1)
  • gammarus (1)
  • Gaula River (1)
  • Gear (113)
  • Gear review (3)
  • gear roll (1)
  • George Grant (1)
  • giant trevally (1)
  • gift (1)
  • gift guide (1)
  • gift ideas (1)
  • Gig Harbor Fly Cast (1)
  • Gig Harbor Fly Shop (4)
  • Gilbert Rowley (3)
  • Glibert Rowley (1)
  • global climate change (4)
  • Gold STone (3)
  • gold stones (1)
  • golden dorado (1)
  • Golden Trout (1)
  • Goldstone (1)
  • grannom (2)
  • grannom caddis (1)
  • grape (1)
  • grass carp (1)
  • grasshopper (2)
  • grasshoppers (1)
  • Grateful Dead (2)
  • Grayling (1)
  • Great White shark (1)
  • green (1)
  • green drake (3)
  • greenland fly fishing (1)
  • guide (2)
  • guided trip (1)
  • h2no (1)
  • habitat (1)
  • hackle (2)
  • hackle stacker (1)
  • hair (1)
  • Happy Father's Day (1)
  • hareline (1)
  • hatch (6)
  • Hatch Magazine (1)
  • hatchery fish suck (3)
  • hatchery vs wild (2)
  • Hatchery Wild Don't Coexist (1)
  • hazard (1)
  • head to the hopper (2)
  • Headhunters Fly Shop (2)
  • Hello. I'm Bali (1)
  • Herman Lucerne (1)
  • high (1)
  • high lake (1)
  • high lakes (1)
  • Hilary Hutcheson (1)
  • History (2)
  • holiday gift guide (1)
  • honest (1)
  • Hooke (2)
  • hopper (5)
  • hopper dropper (3)
  • hopper season (1)
  • hoppers (2)
  • hosmer (1)
  • How To (57)
  • how to fish (1)
  • how to fish streamers (1)
  • how to fly cast (4)
  • how to fly fish (4)
  • how to layer for winter fly fishing (1)
  • how to tie flies (4)
  • Huckberry (1)
  • huge fly fisherman (1)
  • Hunting (3)
  • hunting news (1)
  • ICAST (2)
  • ice fishing (2)
  • iceland fly fishing (3)
  • ideas (1)
  • IF4 (1)
  • IF4 2021 (2)
  • IF4 2024 (2)
  • imago (1)
  • infected (1)
  • infinity (1)
  • insect facts (1)
  • instructiona; (1)
  • Instructional (36)
  • instructional video (1)
  • Interior Fraser Steelhead (1)
  • iowa fly fishing (1)
  • Island Park (1)
  • It's Always Nice To See You (1)
  • Jake Keeler (1)
  • Jako Lucas (1)
  • Jason Rolfe (1)
  • Jay Johnson (1)
  • JEDI (1)
  • Jeff Currier (1)
  • Jeff Liskay (1)
  • jensen fly fishing (5)
  • Jeremy Wade (1)
  • jig (4)
  • jig force short (1)
  • jigged (6)
  • jigged mop (1)
  • Jigged Nymph (2)
  • john (1)
  • John Fabian (1)
  • John Mellencamp (1)
  • Jose Wejebe (1)
  • JT Van Zandt (1)
  • july (1)
  • jungle (1)
  • Kapok Dubbing (1)
  • Kelly Galloup (1)
  • kids fly fishing (2)
  • kinky (1)
  • kinky muddler (1)
  • Kiritimati (1)
  • Knots (2)
  • Kokkaffe Diaries (2)
  • Kona hooks (1)
  • korkers (1)
  • korkers boots (1)
  • lace up (1)
  • lahontan (1)
  • lake (2)
  • lakes (1)
  • Lance Boen (1)
  • Leaders & Tippet (4)
  • leech (1)
  • Legendary Badass (1)
  • legends of fishing (3)
  • legends of fly fishing (11)
  • Lego shark (1)
  • lesson (1)
  • Light (1)
  • line (1)
  • little black stone (1)
  • local (1)
  • log (1)
  • Loon Outdoors (7)
  • Loop (1)
  • lower (1)
  • lower deschutes (1)
  • Lower Willamette (75)
  • Luggage (3)
  • Mad River Outfitters (2)
  • magnitude (1)
  • Magnuson-Stevens Act (1)
  • mahogany (1)
  • mahogany dun (1)
  • maine fly fishing (2)
  • March (5)
  • March Brown (8)
  • Mark Raisler (1)
  • Maryland (1)
  • maryland fly fishing (1)
  • massachusetts fly fishing (1)
  • master (1)
  • master class monday (2)
  • master class mondays (5)
  • match (1)
  • Match The Hatch (3)
  • may (1)
  • mayfles (1)
  • mayflies (2)
  • mayflies across america (2)
  • Mayfly (5)
  • Mckenzie (6)
  • McKenzie River (176)
  • Mckenzie river trust (1)
  • Media & Entertainment (11)
  • mending the line (2)
  • menhaden (1)
  • Menominee River (1)
  • metolious (1)
  • mexico fly fishing (2)
  • Middle (1)
  • Middle fork Willamette River (38)
  • Middle Fork Willamette River fishing (105)
  • midwest (2)
  • mighty (1)
  • Mikey Weir (1)
  • Mill House (1)
  • Millhouse (1)
  • Millhouse podcast (4)
  • mining (1)
  • Missouri River (2)
  • Mohair (1)
  • moment of thrill (1)
  • mongolia fly fishing (1)
  • Monic (1)
  • Montana (1)
  • Montana Fish Wildlife and Parks (2)
  • montana fly fishing (10)
  • mop (1)
  • morning (2)
  • Mossy Oak (1)
  • mothers day (2)
  • mothers day caddis (1)
  • Mothersday caddis (1)
  • muddler (1)
  • museum pieces (1)
  • my other boat is a BOTE (1)
  • nano (1)
  • nanosilk (2)
  • native (2)
  • native trout (1)
  • Neah Bay (1)
  • nemoura (1)
  • nevada (1)
  • new (1)
  • new york fly fishing (1)
  • new zealand fly fishing (1)
  • newfoundland fly fishing (1)
  • News (262)
  • night (4)
  • NOAA (2)
  • NOAA Fisheries (1)
  • nonprofit (1)
  • norcal (1)
  • North Umpqua River Fishing Reports (22)
  • Northern Dynasty Minerals (1)
  • Northwest Youth Conservation & Fly Fishing Academy (1)
  • Not at ICAST (1)
  • not fishing related video (3)
  • Not fly fishing related video (5)
  • november (1)
  • NW Fly Tyer & Fly Fishing Expo (3)
  • Nymph (13)
  • nymphal (1)
  • Nymphing (1)
  • NZ (1)
  • october (2)
  • october caddis (2)
  • october caddis pupa (1)
  • ohwyee (1)
  • Ole Florida Fly Shop (1)
  • Olive (2)
  • One Angler's Voyage (1)
  • one that got away (1)
  • one-minute tying tips (32)
  • one-minute tying videos (2)
  • ops (1)
  • or (1)
  • Oregon (4)
  • Oregon Bigfoot (1)
  • Oregon Coastal Fly Fishing (8)
  • Oregon Conservation News (120)
  • oregon fly fishing (3)
  • Oregon Fly Fishing Clubs and Events (34)
  • Oregon fly fishing links (39)
  • Oregon Fly Fishing Tips (58)
  • Oregon High Lakes (9)
  • Oregon Salmon fly fishing (18)
  • Oregon Saltwater Fishing (5)
  • Oregon Warmwater Fly Fishing (6)
  • Oregon Weekend Fishing Forecast (7)
  • Oregon Winter Steelhead Fishing (14)
  • Orvis (2)
  • Orvis-Endorsed Awards (1)
  • Other News (2)
  • Outside (1)
  • ovipositing (1)
  • Packable (1)
  • pale (2)
  • pale evening dun (2)
  • pale morning dun (3)
  • palometa (1)
  • parachute (1)
  • Patagonia (4)
  • Patagonia Books (1)
  • Patagonia Forra (1)
  • Paul Puckett (1)
  • Paula Shearer (1)
  • Peacock (1)
  • pebble mine (1)
  • ped (2)
  • Pelagic Pursuits (3)
  • Pelton Round Butte Dam (1)
  • People (20)
  • Perch (1)
  • Percision Dry Stealth (1)
  • permit (2)
  • personal watercraft (1)
  • Phelps On The Fly (1)
  • Phil Tuttle (1)
  • Photography (6)
  • pike flies (1)
  • pink (1)
  • pink squirrel (1)
  • pmd (6)
  • PMD Productions (1)
  • pnw (3)
  • Podcasts (51)
  • popcorn (1)
  • popcorn beetle (1)
  • POW (1)
  • Practical Engineering (2)
  • predator (1)
  • presentation (1)
  • pro tips (7)
  • Product (1)
  • Proven Spring Fly Patterns (10)
  • Puget Sound (1)
  • pupa (4)
  • pupae (2)
  • pyramid lake (2)
  • pyramid lake fly fishing (1)
  • quality yanks (1)
  • quartz (1)
  • R8 (2)
  • RA Beattie (1)
  • Ragati Conservancy (1)
  • rainbow (4)
  • Rainbow trout (3)
  • Rare Trout Chronicles (1)
  • red (1)
  • red tail (1)
  • red tail surf perch (2)
  • Red's Fly Shop (2)
  • redband (3)
  • Redband trout (2)
  • redfish (2)
  • Redigton (1)
  • Redington (1)
  • Redington Crux (1)
  • Reel Hustle (1)
  • renzetti (1)
  • report (9)
  • reservior (1)
  • restoration (1)
  • Revelstoke (1)
  • Review (8)
  • Rich Simms (1)
  • Rick Ruoff (1)
  • RIO (4)
  • RIO Fly Fishing Tip (2)
  • Rio Santa Cruz (1)
  • Rio Santa Cruz Steelhead (1)
  • RIP (2)
  • RISE Fly Fishing Film Festival (1)
  • River (9)
  • river ops (1)
  • river smith (1)
  • River Test (1)
  • Riversmith (1)
  • rod (1)
  • Rod & Rivet (1)
  • Rolf Nylinder (7)
  • roll (1)
  • rook (1)
  • rooster (1)
  • rooster fish (1)
  • roosterfish (1)
  • rotart (1)
  • rotary (1)
  • row vs wade (1)
  • run that dog (1)
  • runoff (1)
  • Russ Miller (2)
  • rusty (1)
  • Sage (2)
  • Sage Fly Fish (1)
  • Sage Fly Fishing (1)
  • Sage fly rods (1)
  • Sage R8 (1)
  • Sage R8 Classic (1)
  • Sage Salt R8 (1)
  • sally (3)
  • Salmon (3)
  • salmon and steelhead (1)
  • Salmon and steelhead recovery (1)
  • salmonfly (4)
  • salt (1)
  • salt and pepper caddis (1)
  • Saltwater (4)
  • Saltwater Edge (1)
  • saltwater fly fishing (29)
  • saltwater pattern (1)
  • Save Bristol Bay (3)
  • Save Thompson Steelhead (1)
  • School of Fish (1)
  • School of Trout (1)
  • Science (21)
  • science. (1)
  • scientific (1)
  • score one for the good guys (2)
  • Scorpion Atoll (1)
  • Scruff (1)
  • scud (1)
  • Sea Trout Denmark (1)
  • searching (1)
  • season (2)
  • sedge (3)
  • semper (1)
  • semperfli (2)
  • september (1)
  • sewage spills (1)
  • Seychelles (1)
  • sharks (2)
  • Shilton Reels (1)
  • Shop (2,000)
  • Shop Sales and Specials (6)
  • shopping (1)
  • Short Bus Diaries (1)
  • showing (1)
  • Shrimp (1)
  • shuck (1)
  • silk (1)
  • Silver Kings (2)
  • Simms Fishing Products (1)
  • Simon Gawesworth (2)
  • skeena river (1)
  • Skeena system (1)
  • Skeena Wild (1)
  • skiff life (1)
  • Skiffmule (1)
  • skins (1)
  • skinz (1)
  • skwala (1)
  • sky (5)
  • Skykomish River (1)
  • slab of the month (1)
  • Slider (4)
  • Slightly Moldy Chum (55)
  • slope (1)
  • slovenia fly fishing (1)
  • Sly and The Family Stone (1)
  • Smack Talk (1)
  • small mouth bass (1)
  • smallmouth (1)
  • Smallmouth Bass (2)
  • Snowshoe (1)
  • soft (3)
  • soft hackle (5)
  • soft hackles (1)
  • South Florida (1)
  • South Fork Salt (1)
  • South Island (1)
  • south umpqua (1)
  • Southern Culture on the Fly (1)
  • Southern Oregon (14)
  • spain fly fishing (1)
  • spey (1)
  • spey casting (1)
  • spinner (1)
  • sporting wood (1)
  • spotted (1)
  • spotted bass (1)
  • spring (6)
  • spring creek (4)
  • spring fly fishing (1)
  • Squamish (1)
  • squirrel (1)
  • Steamboat Inn (1)
  • steel (1)
  • steelhead (3)
  • steelhead flies (1)
  • Steve Woit (4)
  • still (3)
  • stillborn (1)
  • stillwater (5)
  • Stillwater Fishing (8)
  • stillwater fly fishing (5)
  • Stio (1)
  • stoke (1)
  • Stone (2)
  • stonefly (4)
  • stop the pebble mine (3)
  • Stories & Essays (38)
  • Straight talk (1)
  • streamer (2)
  • streamre (1)
  • striped bass (6)
  • stripers (1)
  • Subspecies (1)
  • sulphur (1)
  • summer (6)
  • Summer Steelhead (26)
  • Sunday Toona (7)
  • Super 8 (1)
  • Surf (2)
  • Surf fishing (2)
  • Surfperch (2)
  • Svend Diesel (1)
  • swap (1)
  • sweden fly fishing (1)
  • Sweetgrass Rods (1)
  • swift (1)
  • Swiftcurrent (2)
  • swiftcurrent expedition (1)
  • Swiftwater Films (1)
  • swing (1)
  • swinging (1)
  • swinging pupa (1)
  • switch (1)
  • T-Motion Theater (2)
  • tactics (1)
  • Tagsfly fishing tips (1)
  • Tagsfly-fishing tips (1)
  • tail (1)
  • Tailer Trash (1)
  • Tailgate Talks (1)
  • tailwater (1)
  • TAKE ACTION!!! (3)
  • take me to the river (5)
  • tarpon (2)
  • TBT (1)
  • technical (1)
  • Techniques (3)
  • Tellus Fly Fishing (1)
  • Terrestrial (6)
  • terrestrials (3)
  • Texas (1)
  • Texas Coast (1)
  • texas fly fishing (2)
  • the (1)
  • the blob (1)
  • The Cult of Fly Fishing (1)
  • The Drake (1)
  • The Fly Project (1)
  • The Flyfish Journal (4)
  • The Mayfly Project (1)
  • The Mission (5)
  • THE movie (1)
  • the new fly fisher (3)
  • The Pebble Partnership (1)
  • thin (1)
  • thomas (1)
  • thomas & thomas (1)
  • Thomas Chubb (1)
  • throat (1)
  • Throwback fly fishing (11)
  • throwback Thursday (11)
  • Throwback video (1)
  • throwback video Thursday (2)
  • Tigerfish (1)
  • Tight Loops (3)
  • tightline nymphing (1)
  • Tightline Productions (79)
  • tip (1)
  • tips (1)
  • Todd Moen (5)
  • Tom Bie (1)
  • Tom McGuane (1)
  • Tom Rosenbauer (1)
  • Tom's Diner (1)
  • Tomorrow's Fish (1)
  • Tools of the Trade (1)
  • Top 10 (1)
  • top 10 flies (3)
  • top 5 flies (4)
  • top flies (1)
  • topwater action (1)
  • tour (2)
  • Traeger Grills (1)
  • trash (1)
  • trash fly (1)
  • Travel (23)
  • traverse (1)
  • trigger (1)
  • trigger fish (1)
  • Trippin on Trout (2)
  • trout (8)
  • trout diner (1)
  • Trout Hunting NZ (1)
  • Trout master (1)
  • Trout Masters (1)
  • trout rod (1)
  • trout spey (1)
  • trout spey fishing (1)
  • Trout Unlimited (2)
  • Trouts Fly Fishing (5)
  • Troy sucks at fishing (1)
  • True Fact (1)
  • True Facts (1)
  • trust (1)
  • Tsimane Lodge (1)
  • tuesday tip (1)
  • tuesday tips (6)
  • Tuna on the fly (1)
  • Turtlebox (1)
  • Tutorial (7)
  • Tying (40)
  • tying night (1)
  • ultra (1)
  • umpqua (3)
  • Umpqua Feather Merchants (1)
  • Uncategorized (73)
  • Uncle John's Band (1)
  • Undercurrent Podcast (1)
  • understanding (1)
  • UP (1)
  • upcoming (1)
  • update (2)
  • upper (1)
  • US Forest Service (1)
  • utah fly fishing (1)
  • vermont fly fishing (1)
  • Vests & Packs (6)
  • video (1)
  • Videos (2,152)
  • Vintage Chum (14)
  • vintage fly fishing (7)
  • virginia fly fishing (2)
  • wade fishing (1)
  • Wader (2)
  • Waders (2)
  • Waders & Boots (8)
  • Wading (3)
  • Wading Boot (2)
  • wading boots (1)
  • Wading Gear (1)
  • Waist Deep Media (2)
  • walkthrough (1)
  • warm (1)
  • warmwater (1)
  • warmwater fly fishing (15)
  • Washington (1)
  • water (3)
  • water quality (1)
  • Watercraft (2)
  • Watershed Watch (1)
  • we can be heroes (1)
  • wednesday wake-up (14)
  • Wessel Islands (1)
  • west (1)
  • west slope (1)
  • westslope (2)
  • wet (2)
  • wet fly (2)
  • wet wadING (1)
  • What would Quint say? (2)
  • Where the Wild Roam (1)
  • White River (1)
  • widows web (1)
  • Wilamette river (1)
  • Wild Fly (1)
  • Wild Fly Productions (5)
  • Wild Salmon Center (1)
  • wild steelhead (1)
  • wild steelhead now or never (2)
  • Wilde Fische (1)
  • Wilderness Bull Trout (1)
  • Willamette (3)
  • Willamette River (3)
  • willamette valley (2)
  • william g tapply (1)
  • willow (1)
  • willow fly (1)
  • wing (1)
  • Winged (1)
  • Winston (1)
  • winter (2)
  • winter fly fishing (4)
  • winter steelhead (1)
  • winter stone (1)
  • women in fly fishing (2)
  • WTF (1)
  • wyoming fly fishing (2)
  • yakima (2)
  • yellow (3)
  • yellow sally (2)
  • Yellowstone cutthroat (1)
  • Yellowstone Floods (1)
  • Yellowstone National Park (1)
  • Yellowstone River (1)
  • Yeti (4)
  • Yosemite Fly Fishing (1)
  • Yosemite Fly Fishing Guide (1)
  • Yosemite National Park (1)
  • you're acquired! (1)
  • Ze Frank (4)

Popular

  • Euro Nymphing Challenge! Greys Fin Kit – Fly Fishing For Grayling

    Euro Nymphing Challenge! Greys Fin Kit – Fly Fishing For Grayling

    534 shares
    Share 214 Tweet 134
  • Montana Supreme Court Rules in Favor of Kids

    483 shares
    Share 193 Tweet 121
  • After a Century of Abuse, the Arkansas River is on the Rise

    471 shares
    Share 188 Tweet 118
  • Tying Tuesday: Variations on Well-Known Patterns

    466 shares
    Share 186 Tweet 117
  • North Carolina Fly Fisher Rescued After Suffering a Venomous Snake Bite

    455 shares
    Share 182 Tweet 114
  • Landing Page
  • Buy JNews
  • Videos

© Copyright 2021 Fishing Fly Tackle - Powered By Raj Experts.

No Result
View All Result
  • Videos
  • Shop
  • Contact
%d